Skip to main content

Update of the Humber bridge tolling system including the standard system and the free flow one

Peaje Humber Bridge

The scope included the substitution of the present tolling system (cash manual payment) by a mixed system that combines conventional toll lanes and ETC e-toll, and also multilane free flow (ORT).

During the renewal process both systems were working at the same time (conventional and the free flow toll).

The new system allow the vehicles with transponder DSRD (TAG) to circulate by the ORT lanes with no need to decrease the speed or stopping it. And the vehicles with no transponder must stop and pay manually (cash or bank card). This also included non-valid TAGs or with no money.

The SICE site equipment installed was:

  • 4 Multi Lane Free Flow lanes (2 each direction)
  • 6 ETC manual-dynamic lanes (MD conventional, 3 each direction)

The plaza and back office equipment installed was:

  • Toll plaza application servers, for web, training and testing environment
  • Workstations for remote control and operation of the tolling system
  • Disaster recovery center

 

puente_humbert1

puente_humbert2