Mass transport in Barquisimeto
Installation of a mass-transport system for the city of Barquisimeto in Venezuela.
Transbarca (Venezuela)
Installation of a mass-transport system.

The means of transport selected was the trolley-bus — an articulated bus with electrical (main) and mechanical (auxiliary) traction — since the electrical power system used has a very low environmental impact.

The network consists of 48 stations (46 split and 2 head terminuses) distributed over the trolley-bus routes. SICE is responsible for the following subsystems:

Centralisation of the city’s traffic lights:
  • Traffic-light system at 117 crossings on trolley-bus routes.
Control centre:
  • Installation of a VideoWall to control and view the various subsystems in the network. The VideoWall is made up of six 50” DLP back projectors in a 3 x 2 layout.
Communications network:
  • Gibabit Ethernet network
Operations-support system — unifying all the information from the subsystems.
  • Intruder control at stations
  • TAG-based control of trolley-bus locations
  • Traffic-light control on each platform.
Ticketing system:
  • 2 PSO terminals (TPV) at each twin station, responsible for management, control and ticketing for access to the stations .
  • 76 Automatic sales units
SCADA:
  • Monitors, supervises and acts on the various electricity substations responsible for powering the trolley-buses' overhead contact line.
Telephone switchboards:
  • At each POS terminal (TPV) and rectification post (PR) an IP telephone was installed for communications with the control centre.
Closed-circuit TV — to control events at stations, the following items will be installed:
  • 2 fixed cameras and one dome at each station
  • 3 fixed cameras and 7 domes at each terminus
  • 9 domes at the control centre
Automatic gates —the opening of platform gates and trolley-bus doors is synchronised, by each trolley-bus communicating with the corresponding platform. In order for the trolley-buses doors to open, it must be correctly positioned.
  • 3 automatic gates per platform, making a total of 348 gates.
  • Gate-opening management units on each trolley-bus (80)
  • Platform gate-opening management units (116)
PA system:
  • All stations have background music controlled from the control centre (CC).
  • Over this system here live and pre-recorded messages can be issued at stations.
  • The ticket-office worker has a desktop microphone.
Access control — turnstiles installed at stations to control access by passengers.
  • 3 turnstiles per twin station (138)
  • 16 and 12 at terminuses
  • Access gates for disabled people (100)
Control of trolley-bus routes and journey times:
  • Via 42” plasma screens (205) at stations (2 at twin stations, 101 and 12 at head stations), passengers are informed about the ETA of the next trolley-bus and average journey times between stations.
Contact
Transport Department
C/ Sepúlveda, 6
28108 Alcobendas
Madrid. Spain.
Tel.: (+34) 91 623 22 00
Fax: (+34) 91 623 22 01
E-Mail: transporte@sice.com
 
SAIH station at Gabriel y Galán reservoir
News
Events
User involvement

We hope to be able to count on your active involvement, by letting us know your opinions, comments, suggestions and criticisms or any ideas that you think could help us to improve.